During the last few weeks the second fix plumbing and electrical have been installed, the second fix carpentry is well under way and the decoration and tiling have started. You will see from the pictures that the air source heat pump is now in place are the solar panels on the roof so the service cupboards are resembling mission control. The air pressure test has been booked for the week before Christmas and the Building Inspector for the first day back after so fingers crossed we should be in early January as I had always hoped.
Bathroom Tiling
Log Store