During the last few weeks a great deal of work has gone on from the floor screed being put down in the house to the garden levels being built up, we have also had the first fix electric installed and the house has started to be plaster boarded.
Outside the Soak-away has been dug and the storm drainage connected, the patio areas have been stoned up ready to take the slabs and the drive level has been made up.