This week the over head power cables are being moved so the trench you can see in this picture has been opened up to Western Power electric cables and other buried services in to the field.
This picture shows the fireplace being constructed
This Picture shows the front porch
Progress on the brickwork has been taken up to 2/3 height of the window and scaffold is now required so the brickwork can be constructed up to first floor joist level.
No comments:
Post a Comment